Pipework

The pipework was run in heavy duty galvanised gun barrel piping and bracketed to existing containment that was attached to the framework of the generator sets. Each generator has their own set of “flow and return” lines that are independent to the other gen-sets for increased reliability. All pipework was subject to thorough pressure testing before the fuel system was finally commissioned.